The Production Run of the Silk 

Test

Winding

 

Fitness Test

Check of all the parameters standard of the raw material (count, elasticity, toughness, neatness, purity, percentage of the moisture, etc.).

Slashing

Part of working with which the silk is wet with water joined to a natural oil to make the yarn more easily machinable.

Winding

First part of working, which is: transfer from the little reel to the cop, the yarn which is on the skein from China.

Doubling

Routine for the coupling in parallel of two or more yarns.

Twisting

Working thanks to which you can twist the yarn which comes from the doubling which can change from a minimum of 60 to a maximum of about 3.000 number of twist for each meter of yarn.

Brovatura

Fixing of the yarn twisted by the steam.

Spooling

Final manufacturing thanks to which it is possible to measure the yarn on each reel (1 kilo of silk count 20 denier correspond to about 450.000 mt.) and above all it is possible to clean it from all the defects thanks to a sophisticated digital electronics equipment.

Quality Control

.

Shipment

.

 

Twisting

Spooling